Stripped off existing tiles. Insulated roof. Fixed new breathable membrane felt and battens. Re-tiled the roof using the existing tiles. Replaced dormer flat roof. New lead flashings. New gutter system. Lowered chimneys.
Completed in 4 weeks.
Stripped off existing tiles. Insulated roof. Fixed new breathable membrane felt and battens. Re-tiled the roof using the existing tiles. Replaced dormer flat roof. New lead flashings. New gutter system. Lowered chimneys.
Completed in 4 weeks.